Today in Navashino (Nizhny Novgorod Region) at the Oka Shipyard, the bulk carrier Navis-3 of the RSD32M project, intended for the Navis company, was launched. In accordance with the contract signed in November 2017, Oka Shipyard JSC will build 8 dry cargo ships of this project.
© Photos from open sources
Series:
Factory number3201 was laid on 05/22/2018 and launched on 12/12/2018. Navis-1
Factory number 3202 was laid down on 26.06.2018 and launched on 28.02.2019.
Factory number3203 was laid on 08/22/2018 and launched on 04/02/2019. Navis-3
Factory number3204 was laid on 09/21/2018.Navis-4
Factory number3205 was laid on 11/27/2018.Navis-5
Factory number 3206 was laid on December 27, 2018.Navis-6
Factory no.3207 was laid on 02/15/2019.Navis-7
Factory number3208 is being prepared for laying the Navis-8
The design of the vessel was developed by the Marine Engineering Bureau (Ukraine), the vessel is designed for marine and mixed (river-sea) transportation of general and bulk cargo, including metal, timber, coal, grain, bulky and heavy cargo, dangerous goods of classes 1, 2, 3, 4, 5, 6.1, 8, 9 in accordance with the RID Code and goods of category B from the IPNG Code.
Technical specifications:
Deadweight (in the sea / in the river)6220/3833t.
Main dimensions: length 123.17 m, width 16.75 m, draft 4.7 / 3.6 m.
Number of holds: 3
Volume of holds: 8804 m
Container capacity: 240 (hold 180, deck 60), TEU
Running speed: 10 knots
Autonomy: 20 days
Crew: 11 people